Skip to main contentSkip to main content

How Long Does It Take to Paint a House Interior? Timeline Guide

Pro House Painters2025-10-057 min read
How Long Does It Take to Paint a House Interior? Timeline Guide

How Long Does It Take to Paint a House Interior? Timeline Guide

Planning an interior painting project? Knowing how long it will take helps you prepare for the work and plan around any disruption. Here's your complete guide to interior painting timelines.

Quick Answer: Interior Painting Timelines

Single room: 4-8 hours

2-3 rooms: 1-2 days

Half house: 2-3 days

Whole house (2,000 sq ft): 3-5 days

Large home (3,000+ sq ft): 5-7 days

Room-by-Room Time Estimates

Bedroom

  • Standard (12x12): 4-6 hours
  • Large with closet: 6-8 hours
  • With trim work: 8-10 hours

    Bathroom

  • Half bath: 2-3 hours
  • Full bathroom: 3-5 hours
  • Master bath: 5-7 hours

    Living Room

  • Standard: 6-8 hours
  • Large/open concept: 8-12 hours
  • With cathedral ceiling: 10-14 hours

    Kitchen

  • Walls only: 4-6 hours
  • Including ceiling: 6-8 hours
  • Plus cabinets: 3-5 days

    Hallways

  • Simple straight: 2-3 hours
  • With stairway: 4-6 hours
  • Multi-level: 6-10 hours

    What Takes Time in a Painting Project?

    1. Preparation (30-40% of total time)

2. Painting (40-50% of total time)

3. Cleanup (10-15% of total time)

Factors That Extend Your Timeline

Wall Condition

Color Changes

Trim and Detail Work

Ceiling Painting

Ceiling Height

Professional vs. DIY Timelines

Professional Painters

DIY Painters

Why the difference?

  • Professionals have better equipment
  • Experience = efficiency
  • Team coordination
  • No learning curve

    Sample Project Timeline

    Painting a 2,000 Sq Ft Home Interior

    Day 1:

  • 8:00 AM: Setup and preparation
  • 10:00 AM: Begin priming (as needed)
  • 1:00 PM: Start painting bedrooms
  • 5:00 PM: First coat complete on 3 rooms

    Day 2:

  • 8:00 AM: Second coat bedrooms
  • 11:00 AM: Begin living areas
  • 5:00 PM: Main living areas first coat done

    Day 3:

  • 8:00 AM: Living area second coat
  • 11:00 AM: Begin trim work
  • 5:00 PM: Major surfaces complete

    Day 4:

  • 8:00 AM: Continue trim
  • 1:00 PM: Touch-ups and details
  • 4:00 PM: Final cleanup
  • 5:00 PM: Walk-through

    Tips for Faster Completion

    Before the Painters Arrive

    1. Move small furniture and decor

2. Take down pictures and curtains
  • Clear counters and shelves
  • Note any repairs needed
  • Choose your colors in advance

    During the Project

    1. Keep HVAC running (aids drying)

  • Maintain access to rooms
  • Minimize foot traffic
  • Keep pets secure
  • Be available for questions

    Planning Around the Work

    Can You Stay Home?

    Helpful Tips

    - Paint bedrooms first (sleep there last)

    • Do kitchen last (most used)
    • Plan meals out during kitchen work
    • Keep one bathroom free

      Get an Accurate Timeline

      Pro House Painters provides detailed project timelines with every estimate. We'll tell you:

      - Exact start and end dates

    • Daily schedule
    • Room-by-room sequence
    • What to expect each day

      Call (860) 926-3009 for your free consultation and timeline!

    Tags:

    painting timelineinterior paintinghome improvementpainting projectConnecticut

    Share this article:

    Our Service Areas:

    We provide professional painting services throughout Connecticut, Massachusetts, and Rhode Island:

    Get a Free Quote

    Ready to start your painting project?

    Loading form...

    Questions?

    Our painting experts are here to help.

    (860) 926-3009

    Premium Products We Use

    Benjamin MooreSherwin-WilliamsEnvirolakSilk Plaster

    Proud Member Of

    Northeastern Connecticut Chamber of CommercePutnam Business AssociationWoodstock Business AssociationBrooklyn Business AssociationPainting Contractors Association

    Ready to Start Your Painting Project?

    Contact Pro House Painters today for a free, no-obligation estimate.

    (860) 926-3009